[update: budgets]
I figured I may as well start to showcase the money going towards the house and the budgets allocated towards the levels/exterior.
Main floor
$10, 000.00 - $12, 000.00 - the big costs are the appliances: dishwasher, fridge, stove, washer/dryer. I don't have any. ANY. As well as the cabinets. This includes the tile, floor restoration, drywall/insull, front door/back door, 2 sinks, 2 faucets, plumbing and electrical and the other [mudding, paint etc]
Second floor
$5000.00 - $6500.00 - this includes the bathroom complete redo, floor restoration, drywall/insull, other mudding, paint etc, electrical, plumbing, stair case restoration, staircase railing,
Exterior
$8000.00 - windows, tin roof, vinyl siding, fence, gravel for the driveway.
So for my entire house [and I've priced a lot of it out already] I want to keep it $25, 000.00 or less. I have a book that I've been writing in for all of the costs so I can actually calculate the exact amount spent. So far I'm at about $200.00. Hahaha. Oh boy.
No comments:
Post a Comment